| Points | pts | Output points of battery CWP. | Point |
| Path | p | Output paths of battery CWP. | Path |
| Count | c | Output counts of battery CWP. | Integer |
| Points | pts | Output points of battery Branching Path. | Point |
| Path | p | Output paths of battery Branching Path. | Path |
| Count | c | Output counts of battery Branching Path. | Integer |
| Anchor Points | AP | Anchor Points. | Point |
| Original Points | OP | Original points for constructing paths. | Point |
| Distance | Dis | Porvide a distance regarding two ends of the winding part to analyse anchor points' position. | Number |
| UP Tolerance | tolup | Tolerance for position analysis. | Number |
| DOWN Tolerance I | tol1 | Tolerance for position analysis. | Number |
| DOWN Tolerance II | tol2 | Tolerance for position analysis. | Number |
| Radius | r | Set the radius for anchor points. | Number |
| Counts | c | Set divisiory counts for each winding arc. | Integer |
| Axis Impact Factor | f | Control the behavior of the third axis in external paths. | Number |
| Normal Vector | nor | The normal vector of each winding plane. | Vector |